Jack Up Mount

 

Design Features :

 

  • Vibration Isolation
  • Sound Isolation
  • Impact Isolation

 

Neoprene JACK-UP System :

 

We believe that the most fool-proof and safest way to establish the air gap is the jack-up or lift-slab method. Plastic sheeting is placed on the sub-floor as a breaker layer, isolators are placed on the plastic sheeting, reinforcing steel or mesh rests on the isolator housings, and the concrete floor is poured. After the concrete has cured, the slab is lifted to elevation by turning adjustment screw cavity above each isolator to any specified air gap between 1" and 4".

                              

 

The following table is a general guide to floor thicknesses and air gaps. All specifications may be modified to your requirements.

 

TYPICAL FLOOR CONFIGURATIONS

 

                                                                                                                  

 

 

Lowest Dynamic Frequency
7.5 Hertz @ 0.3" Deflection. (60 Duro)
 

 

 

 

PLACEMENT OF ISOLATION MATERIALS

 

 

 

POURING OF CONCRETE

 

 

JACK-UP FLOATING FLOOR

 

 

 

 

 

 

 

 

Turret Mount
Round Mount
Easy Mount
Fail Safe Mount
STB Mount
Jack Up Mount
 

 