Role of Consultants, Contractors & Manufacturers Responsibilities of Consultants Write a project specific technical specification that references seismic codes such as IBC, ASCE-7 and clearly defines project requirements. Schedule or specify the ‘Ip’ for each individual piece of equipment and/or system. Require the contractors to submit on restraints and necessary calculation or ALL projects that
Easyflex KIC is proud to have supplied it’s products for the project – Fujairah Business Center, UAE. The huge business centre has a total built-up area of 96,400 sqm, with a 19-storey office tower, a hotel and apartment tower with amenities like a shopping mall, retail centre and parking space for over 670 vehicles. The
Seismic Isolation Products offered by Easyflex Easyflex Brand Restrained Spring Isolators Features * Spring based Seismic Isolators for large sized equipment * Complete with internal noise isolation pads * Include adjusting and leveling bolt * 25mm and 50mm deflection spring available * Loads upto 5000kg and above available Application * Boilers * Chillers * Cooling
The anti-vibration wall mount brackets EFWB are used in order to add structural integrity of long and tall gypsum board walls, which are mounted on anti-vibration pads or based on floating floor. They avoid any direct connection between the double walls, and increase their stiffness. They prevent wall backward motion during earthquakes. It is used
Technologies for Seismically Bracing MEP Equipment Seismic Bracing Assemblies for Conduits including HVAC Ductwork, Piping and Electrical Raceways Conduits, including HVAC ductwork, piping, and electrical conduits and raceways, may also require seismic bracing. ASCE 7 says that: HVAC ductwork needs bracing when the duct has a cross-section 6 ft. or larger or when it weighs